"The Feasibility Study also considered an alternate case should rail unloading capacity be unavailable. Under this scenario a new rotary car dumper would be constructed at the port in addition to a rail loop to allow a full consist to enter the port. Engineering studies were completed and costs developed for the development. However, given recent reductions in iron ore throughput at the port, the Company considers sufficient capacity is likely to exist and therefore, the base case assumes access to existing facilities. The development scenario is presented in detail in the Feasibility Study "
================================================================================================================
Above quote was from march 21 feasibility study...I'm assuming with a Port MOU that management understand the above scenario is flexible?
- Forums
- ASX - By Stock
- MIO
- Ann: Macarthur appoints strategic sub-committee
Ann: Macarthur appoints strategic sub-committee, page-11
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MIO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.98M |
Open | High | Low | Value | Volume |
6.0¢ | 6.0¢ | 5.5¢ | $5.388K | 95.31K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 20787 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 0.052 |
3 | 80560 | 0.050 |
1 | 23833 | 0.041 |
1 | 33366 | 0.030 |
1 | 29888 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 20787 | 1 |
0.058 | 26034 | 1 |
0.060 | 40000 | 1 |
0.075 | 3681 | 1 |
0.081 | 13688 | 1 |
Last trade - 10.54am 27/09/2024 (20 minute delay) ? |
Featured News
MIO (ASX) Chart |