Brett,
It's ore, not concentrate, they'd have stockpiled due to lack of access to a big enough concentrator. I believe the concentrator capacity is currently still the limiting factor for revenue, and even beyond the June expansion probably still so. I believe ore that once ore is being accessed from both T5 and SQ the upgraded concentrator capacity will still be the limit.
Happy to be corrected if I am wrong on this.
EL
Add to My Watchlist
What is My Watchlist?