re: Ann: High Grade Intersections at Barber E... Hangseng just on the problem of every hole having U(some problem)will this increase costs for the plant/design extraction process as a result of location problems-presume that any increase will be swallowed up by a bigger resource.Also on the cutoff grade being higher than most forgive my ignorance but in traditional hole in the ground mining areas of low mineralisation would presumably be left if too expensive to dig up,what happens with Pen.Thanks in advance
- Forums
- ASX - By Stock
- PEN
- Ann: High Grade Intersections at Barber Extend Mi
Ann: High Grade Intersections at Barber Extend Mi, page-59
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEN (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.3¢ |
Change
-0.003(2.17%) |
Mkt cap ! $358.3M |
Open | High | Low | Value | Volume |
11.5¢ | 11.8¢ | 11.0¢ | $555.4K | 4.881M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
32 | 2656980 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 2086517 | 27 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
31 | 2596980 | 0.110 |
37 | 5765672 | 0.105 |
95 | 11905808 | 0.100 |
11 | 685212 | 0.099 |
13 | 654988 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 2086517 | 27 |
0.120 | 8685103 | 70 |
0.125 | 3487417 | 29 |
0.130 | 3662151 | 27 |
0.135 | 2349362 | 16 |
Last trade - 14.41pm 15/07/2024 (20 minute delay) ? |
Featured News
PEN (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online