IMO the reason is because they (Sayona) want to use a more environmentally friendly approach to the process, which means re-vamping a bit. Sayona could have made samples to send to Novonix either on site with the existing equipment or sent some spodumene to a local lab to make hydroxide, however they did neither, instead they sent spodumene all the way back to Australia to be processes into hydroxide and then sent the hydroxide back to Canada to be tested. Why?
Here is the answer. The process improves the environmental footprint by recycling almost all of the chemicals involved using a closed loop system, it can easily be converted to hydroxide and is at least $1000/t cheaper to process. (2015 so likely much more).
Also it paves the way to build LARGER refineries that will be needed.
https://az659834.vo.msecnd.net/eventsairseasiaprod/production-ausimm-public/7919eaa9fc1a4410a21d67b26f19889a
https://sayonamining.com.au/wp/wp-content/uploads/2021/07/SYA_Authier-tests_7-Jul-21.pdf
https://sayonamining.com.au/wp/wp-content/uploads/2022/04/SYA_ASX-Announ_20220404_Novonix.pdf
- Forums
- ASX - By Stock
- SYA
- General Discussion Topics
General Discussion Topics, page-58779
-
-
- There are more pages in this discussion • 85,840 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $339.6M |
Open | High | Low | Value | Volume |
3.3¢ | 3.4¢ | 3.2¢ | $566.0K | 17.07M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 4015802 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 11163134 | 26 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 4015802 | 0.033 |
65 | 12510032 | 0.032 |
34 | 10160331 | 0.031 |
67 | 9855098 | 0.030 |
51 | 8331112 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 11163134 | 26 |
0.035 | 11990993 | 32 |
0.036 | 11970636 | 31 |
0.037 | 8910049 | 33 |
0.038 | 14771457 | 29 |
Last trade - 16.10pm 15/10/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online