yes, assuming that the sensitive analysis is correct, I calculated before that just adding RPM to Korbel indicated portion could triple the g/t.
Now, they will expand the indicated portion in Korbel to maybe 5 Moz or so (possibly at same grade). But they also may have closer to 2 Moz at 2 g/t. Let’s assume for arguments sake:
Korbel 5 Moz @0.4 g/t
RPM 2Moz @2 g/t
Average g/t 0.85
Every 10% grade up is 400 M added to NPV.
Appr. 100% added to grade = 4 Bln added to NPV.
I know this looks incredible and too good to be true. Can someone shoot any holes in my calculations?
Of course I am assuming constant prices which is wrong and will affect numbers. NVA states they will only need to add 20M in Capex for RPM transportation, which I take at face value.
- Forums
- ASX - By Stock
- NVA
- Ann: RPM Gold Deposit Operational Update
Ann: RPM Gold Deposit Operational Update, page-44
-
- There are more pages in this discussion • 326 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.0¢ |
Change
0.005(2.70%) |
Mkt cap ! $40.86M |
Open | High | Low | Value | Volume |
18.0¢ | 19.0¢ | 17.8¢ | $63.16K | 346.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7633 | 18.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.0¢ | 93561 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 88571 | 0.175 |
4 | 129650 | 0.170 |
1 | 3333 | 0.165 |
2 | 53125 | 0.160 |
3 | 134500 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 93561 | 1 |
0.200 | 5000 | 1 |
0.210 | 34516 | 4 |
0.220 | 6000 | 1 |
0.235 | 30000 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online