MEL 0.00% 0.3¢ metgasco ltd

first class comms are paramount, page-8

  1. 534 Posts.
    I don't know a lot about how the size of gas reservoirs is estimated from depth of gas-bearing structures drilled. If we say that the depth is one linear dimension of a volume, then 4.5 times the depth is not 4.5 times the volume but 4.5^3 times the volume. I'll let you get out your calculator and work out what 77*4.5^3 is.
 
watchlist Created with Sketch. Add MEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.