Looking at the map of POG , it does not have much in the way of storage tanks.
As the tanks at Arrowsmith are filled then with the known timing we can have a tanker waiting for shipment.
If we increase production within the JV plus handle other producers products then we would possibly bring on another ship or better still install tanks at POG to handle greater offtake.
If we bring on other producers then the total costs would be shared between all and minimize stand-down time of the ship. It costs a lot of money for a ship to remain in port just sitting. We need to have the ship come into port tie-up and start filling straight away and then sail upon completion...2-3 days depending on size of ship.
- Forums
- ASX - By Stock
- TEG
- Ann: Major Milestone for Cliff Head Oil Export
Ann: Major Milestone for Cliff Head Oil Export, page-14
-
- There are more pages in this discussion • 84 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TEG (ASX) to my watchlist
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.48M |
Open | High | Low | Value | Volume |
0.6¢ | 0.7¢ | 0.6¢ | $156.8K | 26.10M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1160945 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 13724407 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1160945 | 0.006 |
39 | 18636320 | 0.005 |
13 | 10558001 | 0.004 |
8 | 10411000 | 0.003 |
6 | 14444444 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 13724407 | 13 |
0.008 | 7124451 | 13 |
0.009 | 8292386 | 14 |
0.010 | 4601304 | 7 |
0.011 | 1466667 | 2 |
Last trade - 15.51pm 13/08/2024 (20 minute delay) ? |
Featured News
TEG (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Steven Gourlay, Managing Director and CEO
Steven Gourlay
Managing Director and CEO
SPONSORED BY The Market Online