An excerpt :
This requires a suitable plant design and the construction of a flow reactor, taking into account the laboratory results. In this context, realistic extraction rates are to be determined in a field test, and potential negative influences on the regular operation of the geothermal plant itself are to be clarified. In order to be able to provide reliable answers, an operation monitoring system will be developed, tested and optimized as far as possible.
- Forums
- ASX - By Stock
- AKE
- Allkem General Discussion
Allkem General Discussion, page-1634
-
- There are more pages in this discussion • 3,518 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review