Cameo, I don't want to get into a pissing competition with you over this. It is impressive that you can list the equipment used in a mine / quarry to reduce the feed to the desired size. But I don't think you have the required skill set to select the correctly size equipment for a job like this. You don't use a vibrating pan feed for a 160mtpa, this will be a job for a series of D4 to D6 apron feeders. You set your grizzly bars (gap) to the maximum feed size for the following (secondary) crusher. Again a job like this primary cones would be sensible for the required tph. Blasting (Chemical crushing) is always the cheapest means for size reduction but this is no different to any mine / quarry.
Interested to hear how much you think this mega mine will cost to setup?
- Forums
- ASX - By Stock
- HIO
- Ann: Mineral Resource Upgrade
Ann: Mineral Resource Upgrade, page-358
-
- There are more pages in this discussion • 315 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HIO (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.34M |
Open | High | Low | Value | Volume |
2.2¢ | 2.2¢ | 2.0¢ | $12.50K | 595.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 1640000 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 160137 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 1440000 | 0.020 |
5 | 2397815 | 0.019 |
3 | 270000 | 0.018 |
3 | 1117704 | 0.017 |
1 | 288888 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 160137 | 1 |
0.022 | 285648 | 4 |
0.023 | 503721 | 4 |
0.024 | 399999 | 1 |
0.025 | 307439 | 4 |
Last trade - 15.40pm 02/08/2024 (20 minute delay) ? |
Featured News
HIO (ASX) Chart |