Cheers @evanbruce. I know the case re MMG tailings dam and I agree with your summation.
I think it highlights the merits of either:
a) having some exchanges with the greenies which can be spruiked positively in a PFS, OR
b) admitting to the market that the greenies will be an ongoing "itch" that the company can treat by using creams A, B and C (so to speak).
Either way it has to be addressed.
If the PFS doesn't allude to something similar to a) or b) above, then I think the greater market will be concerned that VMS will spend too much time scratching instead of mining? Just my opinion.
Good luck to us all.
- Forums
- ASX - By Stock
- VMS
- Ann: Feasibility Study Manager appointed, and drilling completed
Ann: Feasibility Study Manager appointed, and drilling completed, page-47
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VMS (ASX) to my watchlist
|
|||||
Last
1.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $42.68M |
Open | High | Low | Value | Volume |
1.8¢ | 1.8¢ | 1.8¢ | $21.51K | 1.217M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
21 | 5111488 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.8¢ | 1439856 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 5111488 | 0.017 |
18 | 3269695 | 0.016 |
8 | 2552162 | 0.015 |
4 | 1510000 | 0.014 |
7 | 2119067 | 0.012 |
Price($) | Vol. | No. |
---|---|---|
0.018 | 1439856 | 11 |
0.019 | 3201381 | 14 |
0.020 | 1621322 | 9 |
0.021 | 1247631 | 4 |
0.022 | 1287030 | 6 |
Last trade - 14.43pm 12/08/2024 (20 minute delay) ? |
Featured News
VMS (ASX) Chart |