POD podium minerals limited

Ann: High Grade PGM Intercepts Continue, page-54

  1. 1,381 Posts.
    lightbulb Created with Sketch. 576
    5E Grade1.65 g/t
    1Cu0.07%
    2Ni0.09%
    3Co0


    Haven't assumed anything extra from this:

    2 August 2022:
    The PGM horizon sits physically sit below the base metal horizon towards the hanging wall. An example of the grade transition is shown in Appendix A. Importantly for early-stage mine planning, the PGM – upper horizon currently hosts 12.3Mt at 2.05 g/t 5E PGM and this high-grade allows the study team to assess multiple mining options.

    Nor this (neither have I budgeted for initial strip but the conservative $750m capex budget covers a multitude, incl longer lead time)

    https://hotcopper.com.au/data/attachments/4606/4606634-5dd745342de1e56007be3396d57e42a9.jpg

    Crystal ball gazing - time for some guidance, if only from a third party analyst.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.3¢
Change
0.000(0.00%)
Mkt cap ! $22.48M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 3823 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 63779 1
View Market Depth
Last trade - 10.06am 18/06/2025 (20 minute delay) ?
POD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.