I'm not sure the economics of any project stacks up if you have disastrous technical failures. Unless there's something uniquely complex about conducting this process in Australia that's something that should be resolved simply by copying methods employed in foreign jurisdictions.
Reaper
- Forums
- ASX - By Stock
- APC
- Ann: Letter from the Chair
Ann: Letter from the Chair, page-21
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add APC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.070M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $5.566K | 5.565M |
Featured News
APC (ASX) Chart |