NVA 6.90% 15.5¢ nova minerals limited

Ann: Nova Hits 78m @ 16.0 g/t Gold Within 258m @ 5.1g/t at RPM, page-108

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 11,249 Posts.
    lightbulb Created with Sketch. 29637
    For Victoria Gold's 2016 Feasibility Study only 67% of the Resource was included in the Reserve.

    NVA's planned Feasibility Study will be NVA's first cut Feasibility Study.

    Victoria Gold in 2016 had 3.96 Moz M&I in the resource.
    Victoria Gold in 2016 had 2.663 Moz M&I in the reserve.
    So 67% of the resource converted to reserve.

    Their recovery was 72.9% for Heap Leach. Ounces produced and in the mine plan worked out at 1.884 Moz (70.7% of the Reserve), whereas 72.9% recovery would imply 1.941 Moz contained gold in the mine plan. The difference is probably mining dilution.

    I think for Estelle we need to assume perhaps no more than 67% converted to reserve (conservatively 60%).

    From the recent announcement overall recovery from RPM will be around 88.9%.
    The Scoping Study Phase 1 had 88.6% recovery for the Korbel deposit.


    I would then shave the result by at least 5% for dilution.

    So calculation becomes:

    LOM ounces produced = Ounces in Resource x 60% (assumed Resource to Reserve) x 88% (assumed Recovery ) x 95% (assumed mining Dilution)

    Note - Victoria Gold's 2016 Feasibility Study is no longer on their website. I have a copy but it is 35MB so can't upload it here.
    Last edited by wombat777: 24/08/22
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
15.5¢
Change
0.010(6.90%)
Mkt cap ! $42.15M
Open High Low Value Volume
15.0¢ 16.0¢ 14.5¢ $107.5K 703.1K

Buyers (Bids)

No. Vol. Price($)
3 97305 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 161967 2
View Market Depth
Last trade - 16.10pm 04/10/2024 (20 minute delay) ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.