This is the important bit IMHO,
"In addition to the traditional fuel markets which provide LEU for today’s reactor fleet, there is
significant supply risk in the emerging market for HALEU fuel, required for next generation
advanced SMRs. With no HALEU production capability available anywhere in the West in the
short term, some SMR developers were planning to purchase Russian-sourced HALEU over
the next decade or longer. This has given rise to some urgency around the world to establish
HALEU production capability as soon as possible. The above mentioned HALEU Availability Program, being planned by the US DOE is the most relevant to GLE.
In summary, we believe Western nuclear fuel markets will undergo a fundamental realignment
over the next 12 to 24 months towards a more resilient and sustainable footing, with the aim
of becoming less dependent or free of reliance on Russian and other State-Owned nuclear
fuel suppliers. We believe this realignment could endure for decades, given the renewed focus
on long term energy security.
And let me state again, Paducah will be their biggest target going forward and maybe even with HALEU, but it wont be able to supply anything related to enrichment until sometime in 2027 and that is only Plef 1, when would Plef 2 or Plef 3 (the latter which is HALEU) be available?
Like it has been written numerous times in articles, I have read that there isn't enough DOE HEU to downblend to supply all of their need only a small amount and the AIF was introduced to circumvent that problem and downblending is not part of that, is what I read!
From the latest announcement they said this-:
In February, GLE submitted a response to a Request for Information issued by the US
DOE3 for the establishment of a HALEU Availability Program (i.e., the third opportunity
noted above). In August, the Inflation Reduction Act (IRA) was passed, which makes
important investments in the US nuclear industry, including a US$700m funding
package for the HALEU Availability Program. GLE will explore opportunities to
participate in the Program as it unfolds;
The Inflation Reduction Act (IRA) runs through to early 2026, so Paducah cant be part of that supply, but I reckon there may be an interim solution until Paducah is built an running, namely use Wilmington perhaps as a stop gap? but something that could supply small quantities of HALEU until Paducah is built.
see here-:
The PLEF I commercial project opportunity involves GLE constructing the proposed natural
UF6 production plant utilising the SILEX technology to enrich the DOE tails inventories which
have been stored in the form of depleted uranium hexafluoride (UF6 – containing U235 assays
from 0.25% up to 0.5%) to produce natural grade uranium (assay of ~0.7%). Subject to
completion of the technology commercialisation project, regulatory approvals, financing and
prevailing market conditions, it may be possible the PLEF I plant could commence commercial
operations as early as 2027.
AND they are only talking about Plef1 only, NOT Plef 2 or Plef 3 the latter being HALEU.
Now this from the release re Wilmington!
Prototype testing of pilot-scale separator and gas handling systems at GLE’s Test Loop facility
is well advanced, with the construction of remaining pilot-scale equipment on track to be
completed around the end of CY2023. After integration and commissioning, the full SILEX
technology pilot demonstration facility is expected to be put into service as early as 2024
(assuming acceleration of the commercialisation timeline, as outlined above)
Silex and GLE are currently focused on construction of full-scale laser and separator
equipment which will be deployed in GLE’s Test Loop facility in Wilmington, North
Carolina, with the aim of completing a commercial pilot (TRL-62) demonstration of the
SILEX uranium enrichment technology;
Page 7
The Pilot Demonstration Project for the SILEX Technology:
The Pilot Demonstration Project being conducted jointly by Silex and GLE is progressing well
with momentum building. Since their appointments in 2021, GLE’s new CEO Stephen Long
and CCO James Dobchuk are leading GLE’s commercialisation project with great enthusiasm.
Numerous engineering and technical appointments have been made over the past year, and
continue to be made for both the GLE technology team in Wilmington, NC and for the Silex
technology team in Lucas Heights, Sydney.
Now, I have never said that Paducah won't go ahead or that they may produce HALEU there one day, but they way I read it? is it is physically impossible for them to supply HALEU for the AIS program where HALEU has to be available by early 2026, all I am saying is there may be a stopgap possible by using the Wilmington commercial pilot to produce HALEU, I will leave it at that, make up your own minds, I know some have already, to my mind they have not thought it through enough!
- Forums
- ASX - By Stock
- SLX
- Ann: Operational Update - 25 August 2022
Ann: Operational Update - 25 August 2022, page-2
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SLX (ASX) to my watchlist
(20min delay)
|
|||||
Last
$5.06 |
Change
-0.110(2.13%) |
Mkt cap ! $1.200B |
Open | High | Low | Value | Volume |
$5.18 | $5.25 | $5.00 | $2.306M | 453.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1980 | $5.05 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$5.06 | 199 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1980 | 5.050 |
1 | 2008 | 5.030 |
6 | 12171 | 5.000 |
1 | 1077 | 4.930 |
1 | 609 | 4.900 |
Price($) | Vol. | No. |
---|---|---|
5.100 | 5000 | 1 |
5.160 | 2000 | 1 |
5.190 | 2242 | 1 |
5.200 | 7971 | 4 |
5.250 | 237 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
SLX (ASX) Chart |