Excellent result.
CBE state: "Mineralisation is expected to sub-outcrop under approximately 65m of cover".
Cupric Canyon reported that "sulfide ore is encountered at approximately 70m below the surface at its shallowest" at Zone 5.
So as far as depth below to surface at NCP08 to get to the ore, we are in the same ballpark as Zone 5. This is significant as it implies that boxcut ramp access to an UG mine is likely to be economic, as it is at Zone 5. Ramp access and haulage is significantly cheaper than vertical shafts and winding.
- Forums
- ASX - By Stock
- CBE
- Ann: Vertical Continuity of Cu Mineralisation Confirmed at Ngami
Ann: Vertical Continuity of Cu Mineralisation Confirmed at Ngami, page-18
-
- There are more pages in this discussion • 375 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CBE (ASX) to my watchlist
|
|||||
Last
7.0¢ |
Change
-0.003(4.11%) |
Mkt cap ! $23.17M |
Open | High | Low | Value | Volume |
7.3¢ | 7.3¢ | 7.0¢ | $13.62K | 190.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 99461 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 13900 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 99461 | 0.070 |
1 | 150000 | 0.068 |
3 | 357881 | 0.067 |
1 | 70000 | 0.065 |
2 | 129365 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 13900 | 1 |
0.074 | 54215 | 1 |
0.076 | 300000 | 1 |
0.077 | 119390 | 2 |
0.079 | 37974 | 1 |
Last trade - 16.10pm 11/07/2024 (20 minute delay) ? |
Featured News
HCH
Hot Chili sets up water company as drought racks Chile–but must also build communities a desal plant
CXO
Core Lithium narrowly beats guidance on FY24 spodumene production but 1Y returns still shattered
CBE (ASX) Chart |