    "Therefore, there could be another 5.4days at 17m/day drilling through ophiliotic conglomerate (hard rock), then another 5days drilling through the Vega Alta Fm (at 50m/day), then the fabled Zapato prospect may finally be realised. Therefore, if I had to bet on it, and if drilling starts again "commence this weekend" ASX:MAY, 25/08/2022, as today's announcement suggests, then I would say, based on the above reasoning, and according to my own calculations, 08/09/2022 is black gold day in my opinion." Source: 63321151

    Since this was posted, we learnt that drilling was expected to recommence on 1/09/2022 source: 63456301 Therefore, 5.4days at 17m/day, then another ~5days through the Vega Alta Fm (at ~50m/day) would be about 12/09/2022. This assumes a drilling rate of 32m/day from 01/09 to 12/09 to a depth of ~2655m.

    https://hotcopper.com.au/data/attachments/4657/4657023-b4b8503b9e6d0ebd0ee617ca1f81041c.jpg
    Source: 63511529 Interestingly Deus_EX_102's table predicts interception of the target by 08/09 if 50m/day is sustained.

    https://hotcopper.com.au/data/attachments/4657/4657058-c58e221888175b3b0dbd9bfbcc3b7162.jpg
    Source: 63344891 VOGC also predicts we are at a depth of approximately the Vega Alta Fm.

    https://hotcopper.com.au/data/attachments/4657/4657074-1c1892b4e8ecd09f485f52d9c08ed667.jpg
    Source: 63317863 Another analysis predicts we are also almost near the Vega Alta Fm

    https://hotcopper.com.au/data/attachments/4657/4657079-ad7ebe16005bf07efa010a9334b5bc7b.jpg
    Source: 63321151 Modelling predicts we are about to enter the Vega Alta Fm with a presumably lower density. Then we are supposedly said to enter the prospect with a lower density than the current "hard rock".

    According to Figure 1 in post: 63317863 we can see that there is only about ~100metres (I calculate 93metres), of the ophiliolitic conglomerate layer left to be drilled through, (pretty logical time to be logging and casing) this supposedly has a calculated mGal of ~2.75mGal. We know "masses of lesser density within the Earth's crust typically cause variations in gravitational acceleration" https://en.wikipedia.org/wiki/Gal_(unit), therefore if the density of that strata decreases this would correspond to the observed mGal data. The Vega alta Fm is said to be approximately 2.42mGal, therefore, we might see a similar drill rate to the last time we drilled through a 2.3-2.4 mGal structure, hence, ~50-65m/day for 254m (Vega Alta Fm).
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
-0.001(3.13%)
Mkt cap ! $104.4M
Open High Low Value Volume
3.2¢ 3.2¢ 3.1¢ $22.28K 720.5K

Buyers (Bids)

No. Vol. Price($)
12 1537027 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 1037925 4
View Market Depth
Last trade - 13.37pm 12/11/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.