Thanks. Somehow I'd totally missed that table on first read.
So CAPEX is a total of $58m. The $20m is defined as OPEX, and offset against pre-prod gold sales, so presumably a chunk of the Copenhagen deposit is lower grade and can be processed through the main circuit, with the $17m project profit offset against the sulphide circuit and Blue Spec CAPEX.
- Forums
- ASX - By Stock
- CAI
- Ann: Maiden Blue Spec Reserve underpins expansion for Warrawoona
Ann: Maiden Blue Spec Reserve underpins expansion for Warrawoona, page-13
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable