    Investment highlights King of the Hills (KOTH) project construction complete
    • KOTH project completed within budget of A$226m, under fixed price contracts, with first gold 5 June 2022.

    KOTH mining ramp up in September Quarter
    • Production tonnes below plan (Fig 1). Open pit & underground ramp up delayed by COVID. Additional crews in place since August to accelerate mining. Commercial production expected in December quarter.
    • Grades in September quarter below plan with higher grades expected for remainder of FY23 (Fig 2).
    • Existing Darlot underground mine delivered expected tonnes and grade.

    KOTH processing ramp up in September Quarter
    • KOTH expected to produce 26k – 27k oz in September quarter.
    • KOTH process plant has had sustained periods at design throughput rates (softer oxide feed).
    • Unplanned downtime in the crushing circuit in August reduced availability and mill throughput rates.
    • In September, SAG mill is adjusting to a harder rock blend, transitioning from oxide from stockpiles and open pit. KOTH process plant throughput expansion to ~5.5Mtpa in FY24
    KOTH geology well understood, open in all directions (Fig3) – ore body is in contact zone of substantial Granodiorite intrusion (4km long x 2km wide) Significant upside potential
    • KOTH open pit mine plan extends to 2037 (Fig 4).
    • KOTH 5 yr underground mine plan is only constrained by drilling (Fig 5).
    • Numerous surface targets.
 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
36.0¢
Change
-0.010(2.70%)
Mkt cap ! $2.448B
Open High Low Value Volume
37.0¢ 37.8¢ 36.0¢ $9.825M 26.88M

Buyers (Bids)

No. Vol. Price($)
18 1862724 36.0¢
 

Sellers (Offers)

Price($) Vol. No.
36.5¢ 2312588 9
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.