POS 20.0% 0.4¢ poseidon nickel limited

Black Swan Production Restart, page-265

  1. 2,845 Posts.
    lightbulb Created with Sketch. 113
    "Black Swan Open Pit Dewatering

    The Company has installed infrastructure to dewater the Black Swan open pit, including sprinkler systems to aid evaporation. At current rates, the pit is expected to be dewatered during November 2022.Pit dewatering will allow access to the pit floor so further resource drilling can be undertaken to convert more Inferred Resources to Indicated classification, which is a key pre-requisite for maximising the Ore Reserve in the BFS.This drilling is scheduled to commence late November"
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $16.81M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $33.85K 6.920M

Buyers (Bids)

No. Vol. Price($)
61 69541581 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 8086214 13
View Market Depth
Last trade - 16.10pm 31/10/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.