    Sentinel pass, cloud free, Oct 8 so two days since the 6th posted above.

    Two definite sites and some possible subtle ones.

    The first SW fence was completed with an infill hole (#10 GE image below). The rig probably moved to #12 but may have drilled some holes along the access track but too subtle to be certain.

    [My numbering system for holes is getting mixed up and I will change it.
    The actual sequence is not possible to work out but a relative one is with an announcement or two or 3 coming to sort out what actually happened.]

    https://hotcopper.com.au/data/attachments/4738/4738706-22afa7cc65805c2200144a786a790f61.jpg

    https://hotcopper.com.au/data/attachments/4738/4738709-e8363fd1a6ab8bf1f97dde907fbaded7.jpg

    If only two holes drilled I would suspect holes are going to the 150-250m range for each. A good average daily production rate for an RC rig in my experience. If consistent for the program I expect some happy contractors/drillers and tired offsiders, geos and fieldies.
    Last edited by salpetie: 09/10/22
 
watchlist Created with Sketch. Add DRE (ASX) to my watchlist
(20min delay)
Last
1.7¢
Change
-0.001(5.56%)
Mkt cap ! $63.46M
Open High Low Value Volume
1.7¢ 1.8¢ 1.7¢ $18.14K 1.062M

Buyers (Bids)

No. Vol. Price($)
10 1696568 1.7¢
 

Sellers (Offers)

Price($) Vol. No.
1.8¢ 806086 3
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
DRE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.