Ann: Duketon Nickel Joint Venture , page-2

  1. 9,111 Posts.
    lightbulb Created with Sketch. 908

    Released today:

    Hole TBDD087 intersected 4.55m at 4.05% Ni, 0.74% Cu and 2.71g/t Pt+Pd (including 3.03m @ 5.28% Ni and 3.67 Pt+Pd)

    Note; true width ~50% of reported.

    Best result to date with further results to be released and IGO seem keen to complete further drilling again.

 
watchlist Created with Sketch. Add IGO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.