10th of November I would expect some more VES results. By then hopefully some drilling results or results from the samples being sent off to our possible partner. Hopefully before then we get the estimates / expansion of our JORC study. Then we move to drilling at the other projects. While that is happening we should be working on our water management plans so I would assume once drilling is done we will have those results done. Then that will build our PEA. Once we have done that I would’ve assume while doing the water management we would see the solar power studies progress on the same timeline. Then we will hopefully sign a few MOU’s and then go into the next phase of this project.
drilling is what will take the longest in my opinion but with some good sample results and with all that above I would be confident we would be going into the next phase quiet rapidly then be able to understand a possible time period we could begin production.
- Forums
- ASX - By Stock
- PNN
- Ann: Rincon North VES Geophysics
Ann: Rincon North VES Geophysics, page-15
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PNN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
-0.002(2.02%) |
Mkt cap ! $10.68M |
Open | High | Low | Value | Volume |
9.9¢ | 10.0¢ | 9.7¢ | $6.061K | 62.10K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 15000 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 68081 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 15000 | 0.100 |
2 | 20000 | 0.099 |
1 | 849500 | 0.098 |
1 | 7680 | 0.097 |
1 | 50000 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 68081 | 4 |
0.110 | 87000 | 2 |
0.115 | 110000 | 1 |
0.120 | 39217 | 2 |
0.125 | 192468 | 5 |
Last trade - 12.06pm 14/11/2024 (20 minute delay) ? |
Featured News
PNN (ASX) Chart |