PLS 0.69% $2.88 pilbara minerals limited

Good News & Bad News, page-17501

  1. 1,045 Posts.
    lightbulb Created with Sketch. 299
    • The POSCO plant hasn't been built yet. Mid 2024 ?
    • The Calix upstream production machine is a 'pilot facility only'. Not full production plant maybe to build final version by 2025 ?
      • We are not at P1000 yet, far from it.
      • Apparently there is drilling going on in several spots around the site (esp on the boundary between the two properties We dont even own the Crusher_Sorter yet: Next Jan i think i heard them say.
    • We are not at P1000 yet, far from it.
    • Apparently there is drilling going on in several spots around the site (esp on the boundary between the two properties
    • We dont even own the Crusher_Sorter yet: Next Jan i think i heard them say

    Plenty to keep us busy.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.88
Change
-0.020(0.69%)
Mkt cap ! $8.671B
Open High Low Value Volume
$2.87 $2.93 $2.84 $50.85M 17.65M

Buyers (Bids)

No. Vol. Price($)
1 5000 $2.87
 

Sellers (Offers)

Price($) Vol. No.
$2.88 179945 5
View Market Depth
Last trade - 16.10pm 19/08/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.