MAY 0.00% 2.0¢ melbana energy limited

Ann: Total depth reached at Zapato-1ST, page-272

  1. 334 Posts.
    lightbulb Created with Sketch. 7188
    Hi Deus_EX_102,

    I trust I've answered your queries adequately in Slides 1 to 3 below.

    For those interested my own summary of the release is in Slides 4 & 5.

    I'm very surprised that TD was called at 3,152mMD and outline my reasons at the bottom of Slide 5.

    Hopefully, as has been commented on by many other Posters, we will get a comprehensive update of the forward appraisal plans in the very near term - plans based on a Zapato failure / suspension should have been drawn up some time ago.

    GLTAH
    Cheers
    VOGC

    https://hotcopper.com.au/data/attachments/4789/4789854-1ace5b6eeb4b3316ff4194d8553b9eef.jpg

    https://hotcopper.com.au/data/attachments/4789/4789860-d7e1f3733acb1d08d053b21fe05c50bb.jpg

    https://hotcopper.com.au/data/attachments/4789/4789863-f62e172fe96ea1518cbd967763eae505.jpg

    https://hotcopper.com.au/data/attachments/4789/4789865-856d8ca013c6f6d47fa200ea38f2c0eb.jpg

    https://hotcopper.com.au/data/attachments/4789/4789868-6a1bf14145fb3bccb126655391304e21.jpg


 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.000(0.00%)
Mkt cap ! $67.40M
Open High Low Value Volume
2.0¢ 2.1¢ 2.0¢ $37.57K 1.856M

Buyers (Bids)

No. Vol. Price($)
37 11509043 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.1¢ 1523856 5
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.