The secondary objective Triassic A sandstone is expected to be encountered at 2852m. That is only 7m deeper than the depth reported this morning at 3.00am WST.
The well has recently been progressing at about 18m / 24h period, if you discount last week's 48h downtime for mud pump repairs.
So if they are drilling on a 24h basis, we should reach Trias A sandstone at about 12.20 WST, or if they are only drilling 12h dayshifts we should have reached it at about 08.00 WST.
I expect the former rather than the latter, as the weekly report times suggest that they are drilling on the normal 24h basis
- Forums
- ASX - By Stock
- JPR
- ann this arv
ann this arv, page-12
-
- There are more pages in this discussion • 76 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $38.23M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 227380 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 48118 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 227380 | 0.023 |
1 | 141968 | 0.022 |
1 | 27800 | 0.018 |
1 | 100000 | 0.017 |
2 | 64889 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 48118 | 1 |
0.031 | 200000 | 1 |
0.045 | 22675 | 1 |
0.050 | 170000 | 1 |
0.055 | 35000 | 1 |
Last trade - 10.04am 14/11/2024 (20 minute delay) ? |
Featured News
JPR (ASX) Chart |
Day chart unavailable