my mistake LTR second biggest. A11 IMO will update tonnage to 50MT after extensionally drilling results added to into existing JORC.
- Forums
- ASX - By Stock
- A11
- Ann: High-Grade Drill Results - Highest Grade to Date @4.52% Li2O
Ann: High-Grade Drill Results - Highest Grade to Date @4.52% Li2O, page-67
-
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add A11 (ASX) to my watchlist
(20min delay)
|
|||||
Last
23.5¢ |
Change
0.010(4.44%) |
Mkt cap ! $149.4M |
Open | High | Low | Value | Volume |
23.0¢ | 23.5¢ | 23.0¢ | $118 | 508 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1401 | 23.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 1402 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 87599 | 0.230 |
20 | 234560 | 0.225 |
3 | 101900 | 0.220 |
1 | 10000 | 0.215 |
2 | 103000 | 0.210 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 1402 | 1 |
0.240 | 34973 | 2 |
0.245 | 3500 | 1 |
0.255 | 49999 | 1 |
0.260 | 3332 | 2 |
Last trade - 15.35pm 10/09/2024 (20 minute delay) ? |
Featured News
A11 (ASX) Chart |