PTR finished their well before the drilling on SAL 1 started (same drilling rig) and they waited over 10 weeks to measure the down hole temperature. You have to wait unfortunately. I'm assuming SAL 1 hit high tempertaure/high pressure water but I guess that is normal and not reported. I imagine if they DIDN'T hit the aquifer, that would be a cause for concern and would have to be reported.
Add to My Watchlist
What is My Watchlist?