PLS 0.35% $2.87 pilbara minerals limited

Good News & Bad News, page-17799

  1. 669 Posts.
    lightbulb Created with Sketch. 27
    The only difference between nuclear and coal or gas fired electricity is the heat source for producing steam to drive a turbine which in turn drives a generator. The ancillary equipment (control systems, instrumentation etc.) is vast and requires regular maintenance and replacement with spare parts from counties all over the world and the failure of one small part can render the whole sytem unusable. If we were faced with the situation you envisage I think it would be a whole lot easier to manufacture the minimal parts required to supply solar components than maintaing a nuclear plant.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.87
Change
-0.010(0.35%)
Mkt cap ! $8.642B
Open High Low Value Volume
$2.91 $2.94 $2.83 $58.15M 20.23M

Buyers (Bids)

No. Vol. Price($)
12 137974 $2.87
 

Sellers (Offers)

Price($) Vol. No.
$2.88 2100 2
View Market Depth
Last trade - 16.10pm 14/10/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.