PAX 0.00% 1.2¢ panax geothermal limited

Ann: Salamander-1 Well Sets New Records , page-35

  1. 1,912 Posts.
    We don't want to drag Bertus' attention away from his important work ATM, but maybe if we just politely ask for a brief response to some of the current questions in this thread it might be ok?

    How about the following:

    Is the whole target reservoir considered the "aquifer" or does this term just relate to specific areas within it that hopefully are proven to be high porosity/permeability zones?

    Similarly, are we aiming to use the whole perforated liner section for production or just specific sections of it?

    Now the drilling is complete, is there any indication of fluid flows and is this as expected?

    Could you please give us an idea of the process involved in logging and setting the liner and then the initial short flow and injection test as well as an approximate timeframe for these?

    Who is doing the logging and testing?

    Is it correct that we are aiming for a transmissivity figure above 10-12 D.m to deliver the base case flow rate of 175kg/sec and a brine temp above 145C?

    What degree of certainty should we attach to these initial results when they become available compared to the longer tests done after the one month normalisation period?

    I'll try and send them a bit later if there are no changes.
 
watchlist Created with Sketch. Add PAX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.