SYA 3.03% 3.4¢ sayona mining limited

General Discussion Topics, page-78292

  1. 4,435 Posts.
    lightbulb Created with Sketch. 8682
    For an integrated plant like Sayona is projecting the conversion cost would be around $4500/t of LCE. However you need to understand that the production cost is a 75/25 split, same goes for revenue.

    At the moment contract prices for Carbonate / hydroxide are about $55000 to $60000 per ton and spot prices are close to $80k per ton. It is hard to say if the price of Carbonate or hydroxide will be lower or higher when the carbonate plant starts producing. To keep myself grounded I have used 3 numbers $35,000 (low) $55,000 (medium) and $75,000 (high) to do my forecast price.

    The equation I am using is

    earnings per ton = (Sale price - (production cost * .75)) * .75

    example using $55,000 as the price per ton and $4500 as the production cost.

    EPT = ($55,000 - ($4500 * .75)) *.75
    EPT = ($55,000 - $3375) * .75
    EPT = $51,625 * .75
    EPT = $38,718.75

    If we produce 30,000 tons as projected at NAL our annual total would be $1,161,562,500




 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.4¢
Change
0.001(3.03%)
Mkt cap ! $349.9M
Open High Low Value Volume
3.3¢ 3.5¢ 3.2¢ $1.311M 38.83M

Buyers (Bids)

No. Vol. Price($)
11 2780304 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 10659292 48
View Market Depth
Last trade - 16.10pm 13/11/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.