So all geotechnical risk sits with us? That in my view sits under construction risk with an EPC contractor. The JV and Genex via Entura would have to done substantial geotechnical investigations.
This may be considered a variation and hence GNX has to cough up.
- Forums
- ASX - By Stock
- GNX
- Ann: Kidston Pumped Storage Hydro - Construction Update
Ann: Kidston Pumped Storage Hydro - Construction Update, page-6
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $380.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GNX (ASX) Chart |
Day chart unavailable