JPR 0.00% 2.5¢ jupiter energy limited

Ann: Trading Halt , page-64

  1. 12,688 Posts.
    lightbulb Created with Sketch. 266
    From a week ago,
    TriassicA is expected at 2852m which in offset wells
    is a more massive verion of the sand at 2798m.
    It should also have good shows.This zone is a
    secondary target.

    17 march-2872m before tripping out.
    Going forward it is expected that there will be 40-50 of interbedded carbonates and thin sands and there should continue to be some oil shows through this zone.(triassicA)
    5-10m claysone before entering the
    mid triassic(primary target).

    Potential oil zone 2705-2719m 14m gross (12m net)

    Hydrocarbons from 2798-2817m (19m)

    They didn't mention secondary targets until the last week and they didn't expect any other zones.

    They are not that fast to drill that much in 27 hours to call a t/h before entering the primary target.If they called it on friday before 10am it woulds be plausible.

    Twice they mentioned secondary targets and the t/h is announced as they enter it.

    Will there be 3 zones before entering primary target.

 
watchlist Created with Sketch. Add JPR (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.000(0.00%)
Mkt cap ! $31.84M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 275378 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
3.6¢ 40000 1
View Market Depth
Last trade - 16.12pm 06/08/2024 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.