It was an ultra high-speed construction in 194 days and a second FSRU (Floating Storage and Regasification Unit) will be in operation by eoy.
The plan is to have not less than 7 FSRU operating by end of 2023 capable to process 1 TCF of gas per year (we had not one LNG-Import-Terminal in Germany at the beginning of this year…).
65% of imported gas per year resp. 1.85 TCF/y was natural gas piped from Russia in the past (another example is Austria with 80% share) which must now be replaced by new import routes…
Europe will be for years in a very strong demand for LNG…
- Forums
- ASX - By Stock
- STX
- beach energy
beach energy, page-220
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $572.1M |
Open | High | Low | Value | Volume |
20.0¢ | 20.3¢ | 19.5¢ | $1.138M | 5.714M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
37 | 1354940 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 1925583 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
37 | 1354940 | 0.195 |
52 | 2313872 | 0.190 |
24 | 1074427 | 0.185 |
25 | 1179467 | 0.180 |
7 | 139258 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 1925583 | 11 |
0.205 | 1086191 | 8 |
0.210 | 3279528 | 12 |
0.215 | 1024883 | 13 |
0.220 | 1286949 | 18 |
Last trade - 16.10pm 29/07/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |