Hi @1MarcusAurelius
Here is the updated image of the southern inland strand pit.
Picture on the left is from the 14th of November, the right is the 19th of November,
They are speeding through removing what I assume is the overburden, I will provide the updated images around the production facility, it appears to be some changes to the stockpile.
Looking forward to the confirmation the processing of this material has commenced. with 6 weeks left in the QTR, any production is unlikely to be sold this QTR, but it sets up MRC perfectly for January and beyond.
- Forums
- ASX - By Stock
- MRC
- Ann: Further Updated Appendix 3B
Ann: Further Updated Appendix 3B, page-9
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.59M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRC (ASX) Chart |
Day chart unavailable