It's going to be very interesting this next lot of assays, in my mind it is essentially Cathedral VS RPM South. The victor could very well determine where the processing facility is located. I think it would be hard to move it south to RPM with the bulk of the material coming out of Korbel, so anything above 0.5-0.6g/t coming out of Cathedral would see it remain where it is IMO. If Cathedral comes in at the same grades as the rest of Korbel then management have a bit more thinking to do...
If this does eventually develop into a working mine, I think management will have earned these "cheap" options, although I hope they will be a bit more conservative in the future splashing them around.
- Forums
- ASX - By Stock
- NVA
- Ann: Results of Meeting
Ann: Results of Meeting, page-24
-
- There are more pages in this discussion • 213 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NVA (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.005(3.23%) |
Mkt cap ! $38.96M |
Open | High | Low | Value | Volume |
15.5¢ | 16.0¢ | 15.5¢ | $40.76K | 260.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 20036 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 50778 | 0.155 |
4 | 141834 | 0.150 |
4 | 175742 | 0.145 |
3 | 420000 | 0.140 |
2 | 27000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 20036 | 1 |
0.175 | 10000 | 1 |
0.180 | 37701 | 4 |
0.185 | 5555 | 2 |
0.195 | 104995 | 2 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online