Hi PP2, puting my lawyer hat on, asuming all work undertaken todate by Cloughs for TNG has been paid for then all calculations, drawings and associated workings would be the property of TNG. TNG BoD should have protected TNG with appropriate contractual conditions too. In my mind the real issue is who takes over the job and what are the likely additional delays.
Just another cock up caused by historic delays exposing TNG to further delays.
- Forums
- ASX - By Stock
- TVN
- Ann: Clough Appointed as Lead Engineer & Preferred EPC Contractor
Ann: Clough Appointed as Lead Engineer & Preferred EPC Contractor, page-73
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $86.40M |
Open | High | Low | Value | Volume |
4.7¢ | 4.9¢ | 4.7¢ | $26.27K | 543.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 259125 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 61632 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 259125 | 0.047 |
5 | 611000 | 0.046 |
8 | 908452 | 0.045 |
1 | 227295 | 0.044 |
2 | 59408 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 61632 | 1 |
0.050 | 855582 | 5 |
0.051 | 522781 | 3 |
0.053 | 147612 | 1 |
0.054 | 25000 | 1 |
Last trade - 15.57pm 24/09/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Steven Gourlay, Managing Director and CEO
Steven Gourlay
Managing Director and CEO
SPONSORED BY The Market Online