Looks like they hit nameplate production in week 5 @ ~90,000ozpa run rate. The higher cash costs simply reflect the higher production costs in earlier weeks 1-4, so s/s costs will be lower when they run at equivalent to "week 5" from this point on. Good result overall. And rain over Marble bar will help boost their water storage too. Onwards and upwards.
All IMHO, DYOR
- Forums
- ASX - By Stock
- CAI
- Ann: Commercial production declared at Warrawoona Gold Project
Ann: Commercial production declared at Warrawoona Gold Project, page-16
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online