A few months ago it was advertised that the Hxdroxide plant should be built directly down in the valley and not shipped halfway around the world, in order to keep the ecological footprint small and because the car companies / governments would want it that way.
This is exactly what some users here were celebrating...now no one wants to know about it anymore?
As I wrote earlier, once the DFS finally comes and the applications to open the mine are submitted to the authorities, the resistance to the project will surely be stronger on the ground.
Until now, it has always been advertised that around 400 jobs would be created locally.
08.06.2022
Minute 0.28
Drilling in the next few months
Minute 1:52 There are several partners in Europe for the construction of the hydroxide plant.
https://www.youtube.com/watch?v=AncL-KnNLP4
02.11.2022
Minute 2:40 European Lithium will be the first to build a hydroxide plant in Europe for Europe.
https://www.youtube.com/watch?v=QLzb5ZKavrI
- Forums
- ASX - By Stock
- EUR
- Ann: Non-binding MOU executed to build & operate hydroxide plant
Ann: Non-binding MOU executed to build & operate hydroxide plant, page-105
-
-
- There are more pages in this discussion • 117 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $51.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EUR (ASX) Chart |
Day chart unavailable