Not a single institutional investor would be allowed to go near a microcap of this size (it is too small, and there is no liquidity in the stock to allow them to build - or exit - a position). When you realise that simple fact, you realise that this announcement is designed to keep retail investors interested in the stock. Nothing more or less.
Unfortunately I think they’re doing their level best to keep the project alive as long as possible, and therefore continuing to draw their salaries. Look back to the ROY days, you’ll see the same stuff.
- Forums
- ASX - By Stock
- MGT
- Ann: Razorback Project Optimisation Studies
Ann: Razorback Project Optimisation Studies, page-25
-
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
|
|||||
Last
29.5¢ |
Change
0.030(11.3%) |
Mkt cap ! $29.03M |
Open | High | Low | Value | Volume |
27.0¢ | 29.5¢ | 27.0¢ | $26.58K | 92.81K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10169 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.0¢ | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10169 | 0.295 |
1 | 31059 | 0.290 |
1 | 100000 | 0.285 |
5 | 122250 | 0.280 |
2 | 11999 | 0.270 |
Price($) | Vol. | No. |
---|---|---|
0.310 | 15000 | 1 |
0.320 | 285000 | 1 |
0.350 | 7714 | 2 |
0.400 | 5045 | 2 |
0.420 | 3500 | 1 |
Last trade - 13.43pm 01/07/2024 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online