Agree. Have to do something while waiting for Ann. Playing with Sentinel fills in the time.
I would like to hear something by the end of this month.
Here's hoping:
"BSOPP is expected to be operating at an approximate 80Ktpa SOP production run rate by Q1
CY2023, with the targeted 120Ktpa run rate established by Q3 CY2024."
Very much doubt 120Ktpa by Q3. No change on the ponds (Nothing been done above the airstrip)
- Forums
- ASX - By Stock
- KLL
- Ann: Beyondie SOP Plant Operations Update
Ann: Beyondie SOP Plant Operations Update, page-309
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable