CTP 1.92% 5.1¢ central petroleum limited

up-ramp, down-ramp: a cognitive study, page-36

  1. 15 Posts.
    Phase 1 is

    5 CSG Wells
    Seismic
    2 Conventional Wells Ooraminna 2 and Johnstone 1
    Gore in EP115

    Phase 2


    Represents the rest of the Conventional wells

    The CSG Core holes do not cost $5m as you suggest.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.1¢
Change
-0.001(1.92%)
Mkt cap ! $37.74M
Open High Low Value Volume
5.2¢ 5.2¢ 5.1¢ $21.21K 413.2K

Buyers (Bids)

No. Vol. Price($)
1 914693 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 109110 3
View Market Depth
Last trade - 15.48pm 25/06/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.