    There's a difference between cutting the portal in the lower wall of the Armstrong pit (currently being dewatered) and getting into production. If the portal is 20 metres above the pit base (so as not to flood the underground) and assuming a 20 metre crown pillar is left under the pit, the first production level will be 60 metres vertical beneath the portal. With the decline ramp at a 1 in 7 gradient that is 420 metres of 5 x 5.5m development. Add in stockpiles, sumps, escape way cuddies, vent drive and level accesses then you are approaching total lateral development of 1000 metres, mostly single heading. Aside from this there is all the vertical development required for vent and escape ways and also grade control plus production drilling. After cutting the portal mid year (hopefully) I can see development ore being trucked by Xmas tis year but production ore will be more like March and that's assuming a top down sequence leaving pillars.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.8¢
Change
0.000(0.00%)
Mkt cap ! $9.901M
Open High Low Value Volume
1.8¢ 1.9¢ 1.8¢ $35.27K 1.959M

Buyers (Bids)

No. Vol. Price($)
4 1570000 1.7¢
 

Sellers (Offers)

Price($) Vol. No.
1.8¢ 335075 2
View Market Depth
Last trade - 15.15pm 26/06/2025 (20 minute delay) ?
WIN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.