ITC 0.00% 8.2¢ impress energy limited

roads open when?, page-6

  1. 975 Posts.
    The roads may open for light vehicles in the short term, as it only takes couple of days of sunshine for a crust to form on the dirt roads. But, as for heavy vehicles, it could take many months for the road base to dry out enough to carry the load. These things take time and you definitely don't want to get a truck bogged to the chassis on some of these road.

    --Dan
 
watchlist Created with Sketch. Add ITC (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.