LKE 5.26% 4.0¢ lake resources n.l.

Ann: LKE Bell Potter Unearthed Conference 070223, page-32

  1. 1,828 Posts.
    lightbulb Created with Sketch. 680

    Hi Sanar5


    I don’t think you fully understand.


    The “original” picture is for the original design ( circa July 2022) for a DFS with a 50ktpa plant.


    Here’s the video reference to 50ktpa.

    https://youtu.be/i5KU7HtwfmU?t=264


    Here’s the same video with reference to the “original diagram” and to the “shed marked with an A”

    https://youtu.be/i5KU7HtwfmU?t=403


    The latest diagram suggest that the footprint has increased and the shed has become bigger for the same DFS target of 50ktpa.


    Do you now agree with me stating my original logic?


    More Plant = More CAPEX and OPEX?


    DYOR

 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.