SYA sayona mining limited

General Discussion Topics, page-88978

  1. 2,012 Posts.
    lightbulb Created with Sketch. 827
    The way i read this is that we require 10% more ore in the concentrator to achieve the desired grade of spod.
    The one physical factor would be the lower 0.94% Li content of the NAL ROM. This is exactly why blending the Authier ROM was desired, to keep that throughput down to achieve the SC6 grade and obviously increase the output.

    This will ultimately affect whether we reach that "nameplate" capacity we are all after. IMHO.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.