Yes I think you describe the basic system -
I believe Grants only is ML 31726. There is a bund around the site .
Note: there needs to be water flowing at discharge point to allow discharge
Refer moire detail here -
https://ntepa.nt.gov.au/__data/assets/pdf_file/0019/1128115/wdl248-lithium-development.PDF
There is a copy of stormwater management plan here - not sure if this "as approved"
https://ntepa.nt.gov.au/__data/assets/pdf_file/0006/1128381/water-management-plan-core-lithium.pdf
There was also an extraction license required to remove water from streams for processing
There is a lot of readingf that coulc be done but basically the point is there is a lot of engineering and science involved in the stormwater management. The performance of the sytem will be reliant on the engineering being sound.
- Forums
- ASX - By Stock
- CXO
- Banter and general comments
Banter and general comments, page-23684
-
-
- There are more pages in this discussion • 15,251 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
|
|||||
Last
9.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $194.4M |
Open | High | Low | Value | Volume |
9.1¢ | 9.3¢ | 9.0¢ | $1.424M | 15.59M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 97919 | 9.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.2¢ | 1856379 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97919 | 0.091 |
12 | 541984 | 0.090 |
4 | 122200 | 0.089 |
8 | 560905 | 0.088 |
11 | 742795 | 0.087 |
Price($) | Vol. | No. |
---|---|---|
0.092 | 1482354 | 3 |
0.093 | 10000 | 1 |
0.094 | 161466 | 3 |
0.095 | 263400 | 7 |
0.096 | 347472 | 7 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |