Yes I think you describe the basic system -
I believe Grants only is ML 31726. There is a bund around the site .
Note: there needs to be water flowing at discharge point to allow discharge
Refer moire detail here -
https://ntepa.nt.gov.au/__data/assets/pdf_file/0019/1128115/wdl248-lithium-development.PDF
There is a copy of stormwater management plan here - not sure if this "as approved"
https://ntepa.nt.gov.au/__data/assets/pdf_file/0006/1128381/water-management-plan-core-lithium.pdf
There was also an extraction license required to remove water from streams for processing
There is a lot of readingf that coulc be done but basically the point is there is a lot of engineering and science involved in the stormwater management. The performance of the sytem will be reliant on the engineering being sound.
- Forums
- ASX - By Stock
- CXO
- Banter and general comments
Banter and general comments, page-23684
-
-
- There are more pages in this discussion • 15,632 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.8¢ |
Change
0.013(10.9%) |
Mkt cap ! $267.8M |
Open | High | Low | Value | Volume |
12.0¢ | 13.0¢ | 11.5¢ | $1.735M | 14.14M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
29 | 2540601 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 9128919 | 76 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
28 | 2540762 | 0.125 |
28 | 2045610 | 0.120 |
51 | 7313184 | 0.115 |
98 | 6115008 | 0.110 |
67 | 4897584 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 9110919 | 75 |
0.135 | 2682416 | 45 |
0.140 | 1331220 | 29 |
0.145 | 1300987 | 25 |
0.150 | 1118052 | 30 |
Last trade - 14.36pm 07/10/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |