    Hi Spid81 the tailings dam will be completed as material becomes available…The blasting so far occurring from pit shell 1 where Grades measured at 40%TGC were located…These grades were not part of the Resouce category…Andrew Cunningham explained in a zoom meeting it’s very hard to stick a drill bit in the ground and not find Graphite at Lindi…

    Ho s your drilling going….? Did someone manage to inform the engineers on standby they were not required for 5 more years…

    The company has reduced costs by starting in the pit location where suitable material for the tailings dam can be provided from…The tailings dam can be lined at any point once required for completion at the lower level…Have already been over this before but once again you twist the truth…

    Regards Croc (First mover advantage over unfunded projects…) Some are still drilling
 