ASO 0.00% 1.0¢ aston minerals limited

ASO - Media, page-109

  1. 2,550 Posts.
    lightbulb Created with Sketch. 366
    Margins are very impressive

    Estimated costs as per MRE and above video presentation.

    Estimated operating costs are incredibly low due to open pit and cheap hydro power on site, estimates come in at $13 per tonne ( mining costs $4 + processing costs $6 + G&A $2 + selling cost $1 = $13 per tonne )

    To calculate margins is simply (.3% nickel x Nickel price x 70% recovery = Significant and robust margins )

    Then estimate size of plant 10, 20 or 40 Mtpa

    This project is going to be a long life, strategically significant Nickel producing Monster.
 
watchlist Created with Sketch. Add ASO (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.000(0.00%)
Mkt cap ! $12.95M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $120 12K

Buyers (Bids)

No. Vol. Price($)
10 2281737 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 38017 1
View Market Depth
Last trade - 09.59am 08/11/2024 (20 minute delay) ?
ASO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.