Spid i dont think the XX Ceo dug a hole and worked out what process needs to be procured to process the inland strand. Bulk sample would have gone to the gurus and i assumed,advised on the process procedure and thsts ehat was bought over 2 years ago. Now tell me what entity bought the 775 rigid trucks to use at Tormin for the Inland strand and why are they in the Northern Cape ? Sold with exellerated depreciation but that only works if you turn a profit. Minimum hrs whilst at Tormin for how long sitting there doing nothing. Then work out the 12T tipper payload from NB to northern pcb and work out how much material is actually virgin material and how much is spoil mixed with it to keep tph up. 2 many questions.
.
- Forums
- ASX - By Stock
- MRC
- Ann: Commissioning Complete for Inland Strands Ore
Ann: Commissioning Complete for Inland Strands Ore, page-8
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.59M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRC (ASX) Chart |
Day chart unavailable