Looks like commissioning is back to 2024 in this announcement.
Below was in the term sheet when raising money from Australian investors last week.
Investment Highlights ✓ Sangdong Project is the worlds largest tungsten mine outside of China
✓ Strategically important, high grade, high margin, long life tungsten and molybdenum mine
✓ Potential mine life of 90-years mine life based on Indicated and Inferred Resources of 58Mt at 0.44% WO3 at production
rate of 640ktp.a2
✓ Fully permitted and construction progressing well, currently at 32% complete with 96% of equipment in-country, targeting
commissioning in mid-2023
- Forums
- ASX - By Stock
- AII
- Ann: Fourth Sangdong Tungsten Mine Loan Facility Drawdown
Ann: Fourth Sangdong Tungsten Mine Loan Facility Drawdown, page-2
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AII (ASX) to my watchlist
(20min delay)
|
|||||
Last
90.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.05M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AII (ASX) Chart |
Day chart unavailable